At today’s meeting, the government of the Republic of Serbia adopted the Decree on the method, conditions and procedure for temporary connection to the electric power network, gas network and/or district heating network, water supply and sewerage of illegally built buildings, which prescribes the methods, conditions and procedures for such connection.